Project: Corporation Street, Belfast

JobFilling of void around drainage pipe in Corporation Street, Belfast.
Main ContractorFarrans
Concrete SupplierNorthstone
Description

Following the installation of a new drainage pipe under Corporation Street in Belfast City Centre, there was a large void remaining which needed to be filled. Due to local ground conditions it was decided that the best option was to use low density foamed concrete flowable fill.

Larsen Foamed Concrete system was chosen to produce approximately 500m3 of foamed concrete (flowable fill) at a density of only 700 kg per m3.

The foamed concrete was made on site using Larsen Foamed Concrete Liquid and specialist, foam generating equipment and mixed in a standard concrete mixer truck.

After hardening, the foamed concrete fill was dressed with compacted blinding before reinstating the road.

This innovative solution facilitated a less invasive method of construction, meeting the engineer’s specification.

PDF Version

  • 05. Filled Void

    05. Filled Void

  • 04. Close-up of foamed concrete

    04. Close-up of foamed concrete

  • 03. Inside mixing lorry

    03. Inside mixing lorry

  • 01. Mixing lorry and Foam generating equipment

    01. Mixing lorry and Foam generating equipment

  • 02. Drainage pipe and void

    02. Drainage pipe and void

  • 06. Filled void finished with blinding

    06. Filled void finished with blinding